Bicycle bridges over Zuid-Willemsvaart
Hollandia Infra delivered 2 steel bicycle bridges, commissioned by Jos van den Bersselaar Constructie BV.
These bicycle bridges are respectively about 33m and 58m long, weighing a total of 125 tonnes and have been installed to bridge both the Zuid-Willemsvaart and the adjacent N279 canal.
The assembly of both bridges was carried out by Van den Bersselaar itself.