Article in GWW about our role during IJsseldelta project - Hollandia

Article in GWW about our role during IJsseldelta project

In the last edition of 2020 of the professional magazine GWW, an advertisement and interview of Hollandia Infra about the IJsseldelta project is published. We did the design, construction and assembly of the lock and sluice gates. For the lock (Scheeresluis), Hollandia realised the retaining devices, movement works and stop logs. For the lock in the Reeve complex, we designed the hydraulic locking system, two single swing gates and a set of spare gates. For the floodgate, we designed four gates with eight hydraulic cylinders that were lifted last summer. Project manager Patrick Bos says that the role we are fulfilling in the redesign of the IJssel delta brings out the best in us. Curious about our contribution to the Isala Delta project? Read the interview in the latest edition of Grond/Weg/Waterbouw Nederland.