After many challenges at the construction site in Southampton, our team succeeded in assembling the first part of the cinema complex. This first part is the heaviest part of the construction (+/- 700 tons) and is self-supporting. To be able to assemble it properly, we use jack-up towers. This allows us to lower the construction after assembly and then ensure that the right parts are loaded with tension and the right parts with pressure. To be continued!