Hollandia Structures commissioned Industrial to assemble the steel structures for the new public transport terminal in Arnhem. Because the space in which the steel structure has to be built is extremely limited, this calls for a sophisticated assembly sequence. The trusses are delivered by truck during the night and brought into Arnhem’s city centre with closures. They are then assembled by Industrial’s expert assembly team during the night. Progress is steady because the time available is very limited!