For our client we have assembled/welded the “locking pins” of the traps of the new Botlek Bridge in the A15 in the past weeks. This was a follow-up order to the assembly of the centring device of the same halyards in the summer of 2014. Both jobs were again a challenge in terms of circumstances and restrictions in the time schedule, but were performed to satisfaction!