Battersea Power Station Pipeline Bridge - Hollandia

Battersea Power Station Pipeline Bridge

Hollandia Industrial has installed a temporary 32 metre pipe bridge at Battersea Power Station.

To limit the time on site, only 4 days, it was decided to deliver as much as possible pre-assembled. On site, only the pipes were installed by third parties in the two bridge sections while they were lying on the concrete foundation. The bridge sections, including the pipes, were then placed on the tower columns. Once again, a flawless execution by our assembly team. The pre-assembly was also carried out in close collaboration with Hollandia Structures BV.