Malaysian Square Pedestrian Bridge, London
For Battersea Powerstation we build this beautiful pedestrian bridge’Malaysian Square’. The pre-fabricated sections have been transported to London and our colleagues from Hollandia Industrial have started the assembly by the 19th of March 2020. Due to the ‘Coronavirus lock down’ all building sites in London had to be closed. It’s expected that the sites will re-open by May 18.