Facilities - Hollandia

Facilities

Hollandia Structures

Heijningen

Our location at the industry of Heijningen lies along the river Dintel and is only a few kilometers removed from the A59 and A29 highways towards Rotterdam, which is 35 km away. Therefore the up- and off-load of materials and constructions happen effortless.

The 53,200 m2 site is equipped with fully automated modern production halls (26,000 m2) the latest tools, laser and paint facilities, storage space, fit out square and dock and offices.

Strategically located close to port of Rotterdam

53,200 m2 production site

26,000 m2 automated production halls

Trainingcentre

Because technical staff is scarce, Hollandia has its own training centre and students are trained on the job. It concerns pre-vocational secondary education students who, in close collaboration with the schools and Hollandia, receive practical and theoretic training to become a three-year process to become a construction fitter at BBL level 3.